RIR
Reps in reserve Also called reps in reserve, repetitions in reserve, reps left in the tank
RIR, or reps in reserve, is the number of good reps you could still have done when you stopped a set.
In plain words
Count the reps you stopped short of, and that is the number. Stop with two good reps in you and the set was 2 RIR. Stop with nothing left and it was 0. The number replaces words like hard and easy with something you can count. It maps onto the lifting RPE scale by taking it from ten: 0 RIR is RPE 10, 1 RIR is RPE 9, 2 RIR is RPE 8, 3 RIR is RPE 7. Past about three reps left, the published scale stops counting single reps and reads RPE 5 to 6 as four to six reps left. Guesses are closer the nearer a set comes to failure.
An example
Squat, 8 reps. The eighth is slow but clean, and you are sure of two more: 2 reps in reserve, RPE 8 on the lifting scale. Written into a plan, that reads as Helms and colleagues write it: 3 × 10 at RPE 8–9, meaning 2 or 1 reps in reserve. One coaching guide counts a set towards the week's volume when it ends at 0 to 4 reps in reserve.
Often confused with
Related terms
Go deeper
Sources
- Renaissance Periodization, Training Volume Landmarks for Muscle Growth Read
- Zourdos et al. 2016. Novel resistance training-specific RPE scale measuring repetitions in reserve. J Strength Cond Res 30(1):267–275 Read
- Helms et al. 2016. Application of the repetitions in reserve-based RPE scale for resistance training. Strength Cond J 38(4):42–49 Read
Updated . How these pages are researched and corrected: editorial policy. Every term in the glossary.